LSFence.ca /Field notes / Equipment

Make room for the work before the crew arrives

Equipment can improve access to a post line only when it can reach the work area. A narrow side passage, overhead obstruction or soft surface may change the installation method. Early access information makes the site visit more productive.

Mini excavator working along a post line; LS project in the Fraser Valley.
Mini excavator working along a post line; LS project in the Fraser Valley. Photo: LS Fencing & Metal Work.

The practical starting point

Equipment can improve access to a post line only when it can reach the work area. A narrow side passage, overhead obstruction or soft surface may change the installation method. Early access information makes the site visit more productive.

Measure the route, not just the gate

Follow the path from the unloading point to the fence line. Note the narrowest width, turns, slopes and overhead restrictions. Include photos looking in both directions. A wide entrance does not guarantee a usable route if a tight turn or obstruction appears a few metres later.

Identify surfaces and buried-service questions

Tell the installer about paving, irrigation, drainage and known service routes. Arrange the appropriate utility-locate process before ground disturbance and flag private services that may require separate identification. Do not use an old sketch or a neighbour’s recollection as clearance to drill.

Let the site determine the method

An auger, mini excavator or manual method may suit different conditions. Ask the contractor to explain the proposed approach, likely surface protection and any limitations. Keep the work area clear only as agreed; cutting roots, moving structures or altering a slope can require additional assessment.

Keep this in your brief

  • Narrowest route width and turning space
  • Overhead and ground restrictions
  • Utility-locate and private-service coordination
  • Agreed surface protection and access date

Discuss the actual site and proposed assembly with LS before ordering or changing an existing fence.

Discuss your fence plan